Installation of Sealless/Glandless Pump

microplastpumps.com > Installation of Sealless/Glandless Pump
  • Install pump as per above sketch with necessary supports.
  • Close outlet valve and open priming valve, fill the water in priming valve pipe until complete suction pipe fill up and water comes from the overflow pipe.
  • Close priming valve and start the pump in direction of arrow water will come from the overflow pipe.  After 2 minutes, open outlet valve gradually and get desired flow at outlet pipe.
  • Always close outlet valve before stop the pump.